Case Studies

Real projects, real results. Here's how we've solved energy challenges for Boulder-area homeowners and businesses.

Mapleton Estate: EV + Battery Integration

Project Type: Residential retrofit with Tesla charging and Powerwall backup.

Challenge: 5,800 sq ft home with aging 100A panel, new Tesla Model 3, and desire for grid-independent backup.

Solution: 200A panel upgrade, 240V hardwired charger, 13.5kWh Powerwall, critical-load sub-panel.

Result: Achieved 10-year payback through utility incentives and EV fuel savings. Home now supports EV charging and 8+ hours of backup power.

Read Full Case Study →

Pearl Street Office Retrofit

Project Type: Commercial 3-phase panel upgrade and EV network.

Challenge: 12,000 sq ft office building needed EV charging for 6 vehicles and solar integration capacity.

Solution: 400A three-phase service upgrade, distributed EV chargers with load-balancing, 50kW rooftop solar prep.

Result: Completed in 8 weeks. Building now attracts EV-driving clients. Solar ready for future phase-2.

Read Full Case Study →

Boulder Public School District Microgrid

Project Type: School facility with solar + battery + demand-response coordination.

Challenge: Aging school building, rising utility costs, need for resilience during grid events.

Solution: 100kW solar array, 40kWh battery backup, smart load management for HVAC and lighting.

Result: 35% annual energy cost reduction. System provides grid support during peak demand events.

Read Full Case Study →

Mountain View Apartment Complex Smart Metering

Project Type: Multi-unit residential smart metering and demand management.

Challenge: 24-unit apartment complex with high shared electrical costs and tenant monitoring conflicts.

Solution: Sub-metering per unit, smart breaker panels, tenant-facing usage dashboards, demand-response integration.

Result: Transparent billing, 18% average tenant-side conservation. Monthly utility rebate of $1,200.

Read Full Case Study →

Niwot Rural Home Off-Grid Hybrid System

Project Type: Residential off-grid solar + battery + micro-hydro integration.

Challenge: 8 miles from nearest utility power, high reliability demands.

Solution: 15kW solar array, 60kWh battery, micro-hydro backup, generator integration.

Result: Fully independent power since 2023. Generator rarely needed. System exceeds 99% uptime.

Read Full Case Study →

Let's Build Your Success Story

Contact us to discuss your project and how we can deliver similar results.

Start Conversation